Charlottesville, VA Lawn Care Calendar

In a typical year, put down crabgrass preventer in Charlottesville between Mar 12 and Apr 17. The best time to overseed is between Aug 28 and Oct 17. The last spring frost usually comes around Apr 3. Most lawns here are cool-season grass (tall fescue, Kentucky bluegrass, ryegrass).

Typical lawn care dates in Charlottesville

Crabgrass preventer (pre-emergent)
Mar 12 – Apr 17
Spring fertilizer
Apr 10 – May 15
Overseeding & seeding
Aug 28 – Oct 17
Fall fertilizer
Sep 21 – Nov 24
Light band: typical frost-free season. Bars: typical windows.
TaskTypical window
Crabgrass preventer (pre-emergent)Crabgrass sprouts once soil stays above 55°F. Apply when soil reaches 50°F, before that happens.Mar 12 – Apr 17
Spring fertilizerA light feeding once soil warms past 55°F and the grass is actively growing.Apr 10 – May 15
Overseeding & seedingLate summer to early fall: seedlings need about 6–10 weeks of growth before the first frost.Aug 28 – Oct 17
Fall fertilizerThe most important feeding for cool-season grass, from early fall until soil cools to about 45°F.Sep 21 – Nov 24

Median dates, 2016–2025, from NOAA weather data for Charlottesville. This year's dates can differ by a few weeks.

Month-by-month lawn care in Charlottesville

  1. JanuaryNo treatments due; mow as needed.
  2. FebruaryNo treatments due; mow as needed.
  3. MarchCrabgrass preventer (pre-emergent)
  4. AprilCrabgrass preventer (pre-emergent)Spring fertilizer
  5. MaySpring fertilizer
  6. JuneNo treatments due; mow as needed.
  7. JulyNo treatments due; mow as needed.
  8. AugustOverseeding & seeding
  9. SeptemberOverseeding & seedingFall fertilizer
  10. OctoberOverseeding & seedingFall fertilizer
  11. NovemberFall fertilizer
  12. DecemberNo treatments due; mow as needed.

Soil temperature in Charlottesville by month

Average soil temperature 4 inches down, estimated from 2016–2025 weather. It bottoms out in January at 37°F and peaks in July at 79°F. Crabgrass preventer goes down when it reaches 50°F, usually around Mar 12.

JanFebMarAprMayJunJulAugSepOctNovDec
37°F41°F48°F57°F65°F73°F79°F76°F71°F61°F49°F40°F

Charlottesville lawn timing, year by year

Over the last 10 years, soil in Charlottesville reached 50°F, the signal for crabgrass preventer, as early as Feb 20 (2017) and as late as Apr 7 (2019): 46 days apart. A fixed calendar date can't follow that, which is why the report above uses this year's soil temperature. Between the typical last spring frost (Apr 3) and first fall frost (Nov 11), the growing season lasts about 222 days.

YearCrabgrass window openedLast spring frostFirst fall frost
2025Mar 13Apr 9Nov 11
2024Mar 5Mar 25Nov 22
2023Mar 24Apr 9Nov 2
2022Mar 17Apr 2Nov 14
2021Mar 25Apr 3Nov 3
2020Mar 10Mar 8Nov 18
2019Apr 7Apr 3Nov 2
2018Feb 21Apr 10Oct 22
2017Feb 20Mar 24Nov 11
2016Mar 9Apr 11Nov 13

Estimated from daily temperatures for Charlottesville. A dash means it didn't happen that year.

Frequently asked questions

When should I apply pre-emergent in Charlottesville?

In a typical year, between Mar 12 and Apr 17. Put it down when soil reaches 50°F, before it stays above 55°F and crabgrass starts sprouting. Early springs move this up by a week or more, so check this year's soil temperature above.

When is the best time to plant grass seed in Charlottesville?

Early fall, typically Aug 28 – Oct 17, while soil cools from 65°F toward 50°F.

When is the last frost in Charlottesville?

The median last spring frost is Apr 3 and the median first fall frost is Nov 11 (2016–2025).

How long is the growing season in Charlottesville?

About 222 days, from the median last spring frost on Apr 3 to the median first fall frost on Nov 11 (2016–2025).

Lawn care guides

More Virginia lawn calendars

Nearby cities in other states